On 26.11.2019, the first excavators rolled on the new premises of Meleghy Automotive in Reinsdorf. 13 months and 22 days later, we start production. In a very short time, a state-of-the-art production plant for welded body assemblies was built. A great achievement by all the trades involved. In cooperation with Goldbeck, DAL, AKE Systemtechnik and our internal project teams, we mastered the construction of a state-of-the-art production hall and the first complex robotic systems that are already producing for the electromobility of tomorrow.
The picture shows Uwe Schneider (l.), Managing Director of AKE Systemtechnik GmbH, and Dr. Thomas Werle, Managing Director Technology and Organization of the Meleghy International Group, with a longitudinal beam for the ID series. (Photo by: Autoland Sachsen/Frank Reichel)